• background
  • background
  • background
  • background
  • background
  • background
  • background
  • background
  • background
  • background
  • background
  • background
  • preview
  • preview
  • preview
  • preview
  • preview
  • preview
  • preview
  • preview
  • preview
  • preview
  • preview
  • preview




PROJECT EXPERIENCES

Electrical Panels

• Distribution Panel
• Motor Control Panel
• Genset Synchronizing Panel
• ATS – AMF Panel & others

Assembling ATS & LVMDP Panel for Building Assembling ATS-AMF for Telecommunication

Electrical Panels

• Distribution Panel
• Motor Control Panel
• Genset Synchronizing Panel
• ATS – AMF Panel & others

ATS , AMF, Genset Synchronizing Panel Explosions Proof Panel

Carrier Set Fabrication (DNV 2-7-1 Standard)

We also fabrication the carrier set system for equipment witch the equipment will place inside the box witch that carrier system suitable for offshore application and in accordance to DNV 2-7-1 Standard. Our products has been worn by PT. SUCOFINDO, and used for transporting meter prove equipment.

fabrication process Load Test as DNV 2-7-1 Standard
Setting-up Meter prove Equipment inside box carrier

Hydrostatic Pump Unit Assembly (High Pressure) 20. 000 PSI

We doing design and manufacture high pressure hydro test and also we can do the hydro testing
services.

box recorder hydrostatic pump test
hydrostatic pump test2

Pertamina Gas

Retrofit 1 Unit Scrubber di stasiun Metering Balongan Wilayah Kerja Distrik Mundu

1 2
3 4

Service And Repair Of Surface Production Facilities for Oil, Gas And Geothermal

We doing some repair and maintenance of surface production facilities such as Valve, Actuator, Choke Manifold, Well Head, Separator, Heat Exchanger etc

3 4
5 service1


Copyright © PT. Patra Energy Swadaya Engineering (PatraEse) , 2014. All Rights Reserved.

Developed & SEO By: Simple C